Haier BD-478A Procedure for filling equipment, Maintenance Service And Trouble Shooting

Models: BD-478A

1 61
Download 61 pages 29.49 Kb
Page 39
Image 39
12.5.3 Procedure for filling equipment

(2)Please keep the pliers, pipe cutting unit and Hansen valve clean, and keep them away from grease dirt.

12.5.3 Procedure for filling equipment

(1) Preparation before use

Visually inspect recovery machine for abnormalities, etc.

Keep all valves closed to equipment until really to proceed.

(2) Evacuation

Connect recovery machine hoses to system fittings

Switch on power.

Switch on motor.

Open all related valves.

Observe the pointer of vacuum meter when it is accessing the mark –1.

Evacuation time shall not be less than 45 min.

After evacuation close valves.

MAINTENANCE SERVICE AND TROUBLE SHOOTING

Maintenance Service and Trouble Shooting

Switch off motor.

38

PDF created with pdfFactory trial version www.pdffactory.com

Page 39
Image 39
Haier BD-478A service manual Procedure for filling equipment, Maintenance Service And Trouble Shooting