Haier BD-478A service manual Installation And Accessory Parts, Installation and Accessory Parts

Models: BD-478A

1 61
Download 61 pages 29.49 Kb
Page 9
Image 9
INSTALLATION AND ACCESSORY PARTS

INSTALLATION AND ACCESSORY PARTS

Installation and Accessory Parts

Unpacking Your Freezer

1.Remove all packaging material; this includes the foam base and all adhesive tape holding the freezer accessories inside and outside.

2.Inspect and remove any remains of packing, tape or printed materials before powering on the freezer.

Adjusting Your Freezer

1.Your freezer is designed for freestanding installation only. It should not be recessed or built-in.

2.Place the freezer on a floor strong enough to support it fully loaded.

3.When moving the freezer, never tilt it more than a 45-degree angle. This could damage the compressor and the sealed system.

4.If the freezer is tilted let it stand in an upright position for at least 24 hours prior to plugging. This is to allow the refrigerant to settle.

·Proper Air Circulation

To assure your freezer works at the maximum efficiency it was designed for, you should install it in a location where there is proper air circulation,

Plumbing and electrical connections.

The following are recommended clearances around the freezer:

Sides…………..2”(50mm)

Top. ……………2”(50mm)

Back…………..2”(50mm)

PDF created with pdfFactory trial version www.pdffactory.com

Page 9
Image 9
Haier BD-478A service manual Installation And Accessory Parts, Installation and Accessory Parts