(1)Operation method of repairing equipment (please see instruction manual).

(2)Special requirements

The time interval from opening of compressor to the beginning of evacuation can not exceed 10 minutes.

The evacuation time shall not be less than 45 min.

In case there is leakage of freezer, if leakage occurs at high-pressure end, it is repairable. Please blow high purity N2 before welding. If leakage occurs at low-pressure end, Check system pressure, if the system has no pressure, the freezer has to be scrapped and change with new one, if there is pressure, it is repairable.

12.3.4 Changing procedure of R134a compressor

(1)Switch power offOpen the protection cover by using cross screwdriver or universal

(2)Screwdriver.

(3)Remove electrical parts of compressor.

MAINTENANCE SERVICE AND TROUBLE SHOOTING Maintenance Service and Trouble Shooting

(4) Remove the four mounting bolts of compressor by using fork wrench or

universal tool.

30

PDF created with pdfFactory trial version www.pdffactory.com

Page 31
Image 31
Haier BD-478A service manual Changing procedure of R134a compressor