Haier CWH08A manual Prepare Air Conditioner for Installation, Install Side Curtains, Back View

Models: CWH08A

1 34
Download 34 pages 51.29 Kb
Page 6
Image 6
Prepare Air Conditioner for Installation

Prepare Air Conditioner for Installation

Install Side Curtains

NOTE: Attach curtains to the air conditioner before placing the air conditioner in window.

1.Locate provided bag of screws.

2.Insert top and then bottom of right-hand curtain housing in top and bottom curtain channels on air conditioner.

Back View

AB

3.Extend right-hand curtain outward so you may insert a ³⁄₈" screw through the top hole in the curtain. Using a ³⁄₈" screw, screw curtain to the top hole in the air conditioner cabinet.

NOTE: This screw is required to correctly attach curtain (top to bottom) to the air conditioner cabinet.

Front View

A. Curtain housing

B. Curtain top channel on air conditioner

4.While the right-hand curtain is still extended, insert ³⁄₈" screws through the other two holes in the curtain. Screw curtain to all three holes in the air conditioner cabinet.

5.Slide the curtain housing into the channels as far as it will go.

6.Repeat above steps for the left-hand curtain.

Bottom View

A

B

A. Curtain housing

B. Curtain bottom channel on air conditioner

6

Page 6
Image 6
Haier CWH08A manual Prepare Air Conditioner for Installation, Install Side Curtains, Back View, Front View, Bottom View