Haier HDU-24H03/H, HDU-42H03/H Refrigerant piping, Installation Manual For Outdoor Unit

Models: HDU-28H03/H HDU-42H03/H HDU-24H03/H

1 37
Download 37 pages 12.57 Kb
Page 24
Image 24
4. Refrigerant piping

Manual background INSTALLATION MANUAL FOR OUTDOOR UNIT

4. Refrigerant piping

Flare connection

Check joint

 

Gas pipe

Service valve

 

 

 

 

(1)

Outline piping

Indoor

Outdoor

 

 

 

unit

unit

(2)

Piping size

 

Liquid

 

 

pipe

Flare connection

 

Model

HDU-42H03/H

HDU-24H03/H

 

 

HDU-28H03/H

 

 

 

 

 

 

Gas piping

19.05(3/4")x1.0mm

15.88(5/8")x1.0mm

0.5

 

Liquid piping

9.52(3/8")x0.8mm

9.52(3/8")x0.8mm

 

90 +

 

Install the removed flared nuts to the pipes to be connected,

 

 

then flare the pipes.

(3) Limitations for one way piping length and vertical height difference.

One way piping length: less than 30m (HDU-24H03/H ,HDU-28H03/H). less than 50m (for HDU-42H03/H).

Vertical height difference: Less than 15m (for HDU-24H03/H ,HDU-28H03/H). less than 30m (for HDU-42H03/H).

Precautions for refrigerant piping

Do not twist or crush piping.

Be sure that no dust is mixed in piping.

Bend piping with as wide angle as possible.

Keep insulating both gas and liquid piping.

Check flare-connected area for gas leakage.

(4) Air purge

a. For HDU-24H03/H , HDU-28H03/H.

Purge air out of indoor unit and piping as shown in the Fig.

(1)Remove the valve cap on 2-way valve in outdoor unit.

(2)Loosen by 1-1.5 turn the flare nut of gas pipe, which is connected to 3-way valve.

(3)Loosen the valve rod of 2-way valve by 90 degrees (use a hexagon wrench) for about 15 seconds, air will be pushed out from flare nut on gas pipe.

(4)Open 2-way and 3-way valves using specified torque.

(5)Tighten the caps on the valves with specified torque.

(6)Conduct gas leakage using gas leakage detector or soap water.

Gas pipe

Liquid pipe 15.88mm(5/8") 9.52mm(3/8")

Flare nut

Manual background 90

Note: When additional refrigerant piping is necessary, first purge air out of connecting pipe by external gas, then drive out the excessive refrigerant by purging method.

Brand new unit is charged 80g more refrigerant than spec. This is only for first installation to purgeair in the indoor unit and connecting pipe.

b. For HDU-42H03/H.

Carry out the air purge of the indoor unit and refrigerant piping by vacuuming.

Procedures:

1)Tighten all the flare nuts of the piping on the side of indoor and outdoor units so that there is no leakage.

2)Carry out vacuuming from the service valve charge port with the service valves (both liquid and gas side) of the outdoor unit fully closed.

3)After vacuuming, remove the cap nut for the valve stem, and tighten the cap nuts (cap nuts for valve stem and charge port) with service valve (both liquid and gas) fully opened.

(5)Method of opening and closing service valve of outdoor unit

1)Remove the hexagonal cap nut.

2)Operate the valve using a hexagonal wrench to open by left turn and to close by right turn.

3)Tighten the hexagonal cap nut after the piping works.

Open

Hexagon wrench (attachment)

23

Page 24
Image 24
Haier HDU-24H03/H, HDU-42H03/H, HDU-28H03/H instruction manual Refrigerant piping, Installation Manual For Outdoor Unit

FAQ

What are the limitations for one way piping length and vertical height difference?

For HDU-24H03/H,HDU-28H03/H, the piping length should be less than 30m. For HDU-42H03/H, it should be less than 50m. The vertical height difference should be less than 15m for HDU-24H03/H,HDU-28H03/H, and less than 30m for HDU-42H03/H.

How to conduct air purge for HDU-24H03/H, HDU-28H03/H?

Purge air out of indoor unit and piping as shown in the installation manual.

What is the method of opening and closing the service valve of the outdoor unit?

Remove the hexagonal cap nut, operate the valve using a hexagonal wrench to open by left turn and to close by right turn, then tighten the hexagonal cap nut after the piping works.