Haier HDU-28H03/H, HDU-24H03/H, HDU-42H03/H Electric wiring, Installation Manual For Outdoor Unit

Models: HDU-28H03/H HDU-42H03/H HDU-24H03/H

1 37
Download 37 pages 12.57 Kb
Page 26
Image 26
5. Electric wiring

Manual background INSTALLATION MANUAL FOR OUTDOOR UNIT

4

Open the valve rod for the 2-way valve to and angle of anticlockwise 90 degree.Manual background After 6 seconds later, close the 2-way valve and male

the inspection of gas leakage.

2-way valve2-way valve

Manual background 3-way valve

 

 

 

 

3-way valve

 

Open

 

 

 

 

Service port

 

Open

Service port

90

90 4 90 for 6 sec.

90

90

4 90 for 6 sec.

5

In case of gas leakage, tighten

No gas leakage?

parts of pipe connection. If

 

leakage stops, then proceed 6

6

steps.

 

Detach the charge hose from the service port, open 2-way valve and 3-way. Turn the valve rod anticlockwise until hitting lightly.

7

To prevent the gas leakage, turn the service port's cap, the valve rod'd cap for 2-way valve and 3-way's a lottle more than the point where the torque increases suddenly.

8

After attaching the each caps, check the gas leakage around the caps.

If it does not stop gas leakage, discharge whole refrigerants from the serice port. After flaring work again and vacuumize, fill up prescribed refrigerant from the gas cylinder.

2-way valve

2-way valve

3-way valve

Liquid pipe 9.52mm

 

3-way valve

6

Gas pipe 19.05mm

6

6

6

 

 

2-way valve

 

3-way valve

 

7 Valve rod cap

7

Valve rod cap

7 Service port cap

CAUTION:

If the refrigerant of the air conditioner leaks, it is necessary to make all the refrigerant out, then charge the liquid refrigerant into air conditioner according to the amount marked on the name plate.

2-way valve

Manual background 3-way valve

7 Valve rod cap

5. Electric wiring

Manual backgroundManual background 7 Service port cap 7 Valve rod cap

Manual backgroundManual backgroundWARNING

DANGER OF BODILY INJURY OR DEATH

TURN OFF ELECTRIC POWER AT CIRCUIT BREAKER OR POWER SOURCE BEFORE MAKING ANY ELECTRIC CONNECTIONS. GROUND CONNECTIONS MUST BE COMPLETED BEFORE MAKING LINE VOLTAGE CONNECTIONS.

(1)Selection of size of power supply and interconnecting wires. Precautions for Electric wiring

Manual background Electric wiring work should be conducted only by authorized personnel.

Manual background Do not connect more than three wires to the terminal block. Always use round type crimped terminal lugs with insulated grip on the ends of the wires.

Manual background Use copper conductor only.

Select wire sizes and circuit protection from table below. (This table shows 20 m length wires with less than 2% voltage drop.)

Item

 

Circuit

breaker

Power source

Earth leakage breaker

 

 

 

 

 

Model

Phase

Switch breaker

Overcurrent protector

wire size

Switch

Leak

 

(A)

rated capacity (A)

(minimum)

breaker

current

HDU-42H03/H

3

30

20

2.5mm2

30

30mA

HDU-24H03/H

1

40

26

4.0mm2

40

30mA

HDU-28H03/H

 

 

 

 

 

 

 

 

 

25

 

 

 

Page 26
Image 26
Haier HDU-28H03/H, HDU-24H03/H, HDU-42H03/H instruction manual Electric wiring, Installation Manual For Outdoor Unit

FAQ

How do I open the 2-way valve for the outdoor unit?

Open the valve rod for the 2-way valve to an angle of anticlockwise 90 degrees, then close the valve after 6 seconds and perform a gas leakage inspection.

What should I do in case of gas leakage?

Tighten the parts of pipe connection to stop the leakage. If leakage persists, a professional technician should be consulted.

How to select the size of power supply and interconnecting wires for the air conditioner?

Detailed instructions for selecting the right wire sizes and circuit protection are provided in the manual.