Haier HDU-42H03/H Installation Manual For Outdoor Unit, 6Additional charge of refrigerant

Models: HDU-28H03/H HDU-42H03/H HDU-24H03/H

1 37
Download 37 pages 12.57 Kb
Page 25
Image 25
(6)Additional charge of refrigerant

Manual background INSTALLATION MANUAL FOR OUTDOOR UNIT

(6)Additional charge of refrigerant

Outdoor unit is precharged at a factory for the piping length up to 5m. Additional charge is not required up to 5m.

 

 

Item

Basic

Factory charge amount

Additional

Length that

Maximum

 

 

refrigerant

of refrigerant

charge

additional

 

 

 

piping

Model

 

charge

 

 

amount (ii)

charge is not

length

 

Outdoor unit

Indoor unit

 

 

 

amount (i)

per meter

required

 

Heat

 

HDU-42H03/H

3.44

3.52

0

0.06

5m (viii)(v)

50m

 

 

 

 

 

 

 

 

pump

 

HDU-24H03/H

2.32

2.40

0

0.06

5m (viii)(vii)

30m

 

 

 

 

HDU-28H03/H

 

 

 

 

 

 

Notes (i) Basic refrigerant charge amount means refrigerant amount when refrigerant piping length is 5m.

(ii)When the refrigerant piping length exceeds the length that additional refrigerant charge is not required, charge additional refrigerant based on to the calculated amount of refrigerant per unit piping length.

Example of additional charge amount calculation

Calculate the additional charge amount when the piping length is 25 m. (25 - 5 ) x 0.06 = 1.2

Manual background Additional charge amount (kg)

Additional charge amount per 1m (kg/m)

Length that additional refrigerant charge is not required (m)

Total length of the piping (one way) (m)

Additional charge amount of refrigerant =0.70kg(Calculate the amount in any case.)

If air perge with the refrigerant is forbidden at the local, please use the vacuum method (Please see the below figure)

To use vacuum pump

1

Detach the service port's cap of 3-way valve, the valve rod's cap for 2-way valve and 3-way's, connect the service port into the projection of charge hose (low) for gaugemanifold. Then connect the projection of charge hose (center) for gaugemanifold into vacuum pump.

2

Open the handle at low in gaugemanifold, operate

vacuum pump. If the scale-moves of gause (low) Manual background 2 Open reach vacuum condition in a moment, check 1 again.

2-way valve Manual backgroundManual background 3-way valve

Gaugemanifold

Vacuum pump

2-way valve Manual backgroundManual background 3-way valve

Gaugemanifold

Vacuum pump

3

Vacuumize for over 15min. And check the level gauge which should read -0.1 MPa (-76 cm Hg) at low pressure side. After the completion of vacuumizing,

close the handle 'Lo' in gaugemanifold and stop the Manual background 3 Close operation of the vacuum pump.

Check the condition of the scale and hold it for 1-2min. If the scale-moves back in spite of tightening, make flaring work again, the return to the beginning of 3 .

24

Page 25
Image 25
Haier HDU-42H03/H, HDU-24H03/H, HDU-28H03/H Installation Manual For Outdoor Unit, 6Additional charge of refrigerant

FAQ

How much refrigerant is precharged at the factory?

The outdoor unit is precharged with refrigerant for piping lengths up to 5m.

When is additional refrigerant charge required?

Additional refrigerant charge is required when the piping length exceeds the length that doesn't require additional charge, based on the calculated amount per unit piping length.

How do I use a vacuum pump for refrigerant purging?

To use a vacuum pump, detach the service ports cap, connect the charge hose low for gaugemanifold to the vacuum pump, vacuumize for over 15 minutes, and check the level gauge for pressure readings.

What refrigerant charge amount is required for model HDU-42H03/H?

The basic refrigerant charge amount for HDU-42H03/H is 3.44 kg, with an additional charge amount of 0.06 kg per meter.

How much additional refrigerant charge is required for a piping length of 25m?

The additional charge amount for 25m of piping length would be 1.2 kg, calculated based on the additional amount per unit piping length.