Heat & Glo LifeStyle SL-950TV-IPI-E Vent Clearances and Framing, C. Vertical Penetration Framing

Models: SL-550TV-IPI-E SL-950TV-IPI-E SL-750TV-IPI-E

1 47
Download 47 pages 38.16 Kb
Page 24
Image 24
8 Vent Clearances and Framing

8 Vent Clearances and Framing

A. Pipe Clearances to Combustibles

Vent clearances are per vent manufacturer’s specifica- tions. MUST be Listed B-Vent pipe.

WARNING! Risk of Fire! Maintain air space clearance to vent. DO NOT pack insulation or other combustibles:

Between ceiling firestops

Between wall shield firestops

Around vent system

Failure to keep insulation or other material away from vent pipe may cause over heating and fire.

B. Wall and Ceiling Penetration Framing

For a wall or ceiling penetration consult B-vent pipe manufacturer’s instructions to provide adequate clear- ances. Use same size framing materials as those used in the wall or ceiling construction. Firestop spacers must be used in wall and ceiling penetrations per the B-Vent pipe manufacturer’s specifications and national, regional and local codes.

Note: MUST terminate vertically.

1 in. TOP

CLEARANCE

1 in. CLEARANCE

AROUND VERTICAL

SECTIONS

1 in. SIDE AND

BOTTOM CLEARANCE

Figure 8.1 Pipe Clearances

C. Vertical Penetration Framing

WARNING! Risk of Fire! DO NOT allow loose materials or insulation to touch vent. Hearth & Home Technologies Inc. requires the use of an attic shield.

The National Fuel Gas Code ANSI Z223.1 and NFPA 54 requires an attic shield constructed of 26 gauge minimum metal that extends at least 2 in. (51 mm) above insulation.

Attic shields must meet specified clearance and be se- cured in place.

Use B-vent manufacturer’s firestops to provide adequate clearances.

24

Heat & Glo • SL-550 / 750 / 950TV-IPI-E2119-900 Rev. J • 12/09

Page 24
Image 24
Heat & Glo LifeStyle SL-950TV-IPI-E, SL-750TV-IPI-E Vent Clearances and Framing, A. Pipe Clearances to Combustibles