
Installation
PREPARATION OF CHASSIS
1.Remove the screws which fasten the cabinet at both sides and at the back.
2.Slide the unit from the cabinet by gripping the base pan handle and pulling forward while bracing the cabinet.
3.Cut the window sash seal to the proper length. Peel off the backing and attach the
4.Remove the backing from the top Upper Guide Foam- Pe and attach it to the bottom of the Upper Guide.
5.Attach the Upper Guide onto the top of the cabinet with 3 type A screws.
Shipping
Screws
Upper Guide
6. Insert the Frame Guides into the bottom of the cabinet.
7.Insert the Frame Curtain into the Upper Guide and Frame Guides .
8. Fasten the curtains to the unit with 4 Type A screws. | (Type A) | Upper Guide |
| ||
| Screw |
|
Screw | Screw | |
(Type A) | ||
|
CABINET INSTALLATION
1.Open the window. Mark a line on center of the window stool(or desired air conditioner location). Carefully place the cabinet on the window stool and align the center mark on the bottom front with the center line marked in the window stool.
2.Pull the bottom window sash down behind the Upper Guide until it meets.
NOTICE Do not pull the window sash down so tightly
that the movement of Frame Curtain is restricted.
Upper Guide |
|
|
| Window stool | |
| Front Angle | Figure 5 |
Window Sash | Upper guide |
|
Cabinet
Frame Curtain
Figure 6
12Room Air Conditioner