GR2K-GA-0008 2-1
Rev. 1.00
Chapter 2Setup Process
This chapter explains briefly about the whole process from unpacking a product
package to powering up the GR2000-B.
2.1, “Check that All Necessary Components are Present,” on page 2-1
2.2, “Assemble the Required Tools for Setup.,” on page 2-1
2.3, “Setting Up the GR2000-B,” on page2-2
2.4, “Dangers, Cautions, and Notes Regarding Setup,” on page 2-5
2.5, “Installing the GR2000-B on a Table or Desk,” on page 2-6
2.6, “Attaching and Detaching the Power Cable,” on page 2-7
2.7, “Installing a Memory Card,” on page 2-8
2.8, “Software,” on page 2-10
2.9, “The Setup Terminal and Cable Connections,” on page2-11
2.10, “Normal Start-Up Process for the GR2000-B,” on page 2-13

2.1 Check that All Necessary Components are Present

Before you unpack the GR2000-B, find the packing list and check the contents of the
box against the list. Make sure that all components are present before you begin t he
setup process.

2.2 Assemble the Required Tools for Setup.

Make sure you have the following tools before you b egin setup. The only tools
required to install and set up a GR2000-B router are:
A #2 Phillips screwdriver for attaching the GR2000-B to a rack
A medium-sized flat-blade screwdriver for attaching cables.