A S S E M B LY STEP 6 |
|
|
|
| LOWER LINK ARM |
| LOWER |
|
| HANDLEBAR | |
| TEFLON WASHERS |
| |
|
| SPACER |
|
| LOWER HANDLEBAR |
| |
GUIDE RAIL |
| NUT (H) | BOLT (E) |
|
|
| SPACER (G) |
LOWER LINK ARM | TEFLON WASHERS (F) |
|
A)Open HARDWARE BAG FOR STEP 6.
B)Slide SPACER (G) into LOWER HANDLEBAR.
C) Place TEFLON WASHERS (F) on either side of SPACER (G). While holding TEFLON WASHERS (F) slide LOWER LINK ARM into bottom end of LOWER HANDLEBAR.
D)Insert BOLT (E) into LOWER HANDLEBAR and secure using NUT (H).
E)Repeat on other side.
IMPORTANT PRECAUTIONS INTRODUCTION
ASSEMBLY
BEFORE YOU BEGIN
ELLIPTICAL OPERATION
CONDITIONING GUIDELINES
HARDWARE BAG FOR STEP 6 CONTENTS :
BOLT (E) 60 mm Qty: 2
TEFLON WASHER (F) 24 mm
Qty: 4
SPACER (G) 44 mm axis Qty: 2
NYLON NUT (H)
INSIDE DIAMETER:
8mm Qty: 2
13