Installing the Switch
Installation Procedures
5.Connect power to the switch (page
6.(Optional) Install or remove
7.Connect the network cables (page
8.(Optional) Connect a console to the switch (page
At this point, the switch is fully installed. See the rest of this chapter if you need more detailed information on any of these installation steps.
1. Prepare the Installation Site
Cabling Infrastructure - Ensure the cabling infrastructure meets the necessary network requirements. See Appendix B “Cabling and Technology Information” for more information.
■Installation Location - Before installing the switch, plan its location and orientation relative to other devices and equipment:
•In the front of the switch, leave at least 7.6 cm (3 inches) of space for the
•In the back of the switch, leave at least 3.8 cm (1 1/2 inches) of space for the power cord and cooling.
2. Verify the Switch Passes Self Test
Before mounting the switch in its network location, you should first verify it is working properly by plugging it into a power source and verifying it passes self test.
Switch the Installing