Feature | Specification |
|
|
Charging | Complete charge takes no more than 48 hours. After |
| approximately 3 hours, the batteries reach 80% charge at default |
| nominal utility voltage and no load. |
|
|
High-voltage UPS battery runtimes
Load, percent | Estimated battery | Runtime with one ERM | Runtime with two ERMs |
| runtime |
|
|
|
|
|
|
20 | 40 minutes | 125 minutes | 225 minutes |
50 | 12 minutes | 50 minutes | 89 minutes |
80 | 6 minutes | 30 minutes | 54 minutes |
100 | 4 minutes | 24 minutes | 43 minutes |
Low-voltage UPS battery runtimes
Load, percent | Estimated battery | Runtime with one ERM | Runtime with two ERMs |
| runtime |
|
|
|
|
|
|
20 | 45 minutes | 142 minutes | 256 minutes |
50 | 15.5 minutes | 55 minutes | 99 minutes |
80 | 7 minutes | 34 minutes | 60 minutes |
100 | 5 minutes | 26 minutes | 47 minutes |
Environmental specifications
Feature | Specification |
|
|
Operating temperature | 10°C to 40°C (50°F to 104°F); |
| (77°F) |
|
|
Nonoperating | |
temperature |
|
Relative humidity | 20% to 80%; noncondensing |
Operating altitude | Up to 3,000 m (9,842 ft) above sea level |
Nonoperating altitude | 15,000 m (49,212 ft) above sea level |
Audible noise | Less than 45 dBA, normal operation |
| Less than 50 dBA, on battery power |
|
|
REPO port specifications
The REPO port meets the requirements of NFPA 70 and NEC Articles
Specifications 63