Assembly: crank and lifting cable |
|
|
|
| (17) Thread the lifting line under |
|
| the outside pulley on the lifting |
| A | beam, straight up and around |
| the pulley on the cross beam | |
|
| |
|
| (A) and then down again to the |
|
| inner pulley on the lifting beam. |
|
| Fit the crank rod through the |
|
| upper hole in the long leg and |
|
| through the bushing on the |
|
| middle flange. |
|
| Place the lifting line in the |
17 |
| locking collar recess. Thread |
|
| the collar bushing with the line |
|
| and the other collar bushing, on |
|
| the crank rod.(collars facing out) |
|
| Push the crank rod through until |
|
| app. 1/8” extends beyond the |
|
| outer saddle plate bushing. |
|
| Screw the locking screw |
|
| (M6x8)on the locking collars into |
|
| the recesses on the crank rod. |
|
| Then tighten the locking screw |
|
| (M8x8) that’s holding the lifting |
|
| line. |
Assembly: edge support
18 |
A |
14 |
(18)Slide the edge support onto the log bed.
(A)Attach crank handle to the crank rod. Insert an allen wrench into the end of the threads on the handle and tight it with an m8 locking nut.