Assembly: crank and lifting cable

 

 

 

 

(17) Thread the lifting line under

 

 

the outside pulley on the lifting

 

A

beam, straight up and around

 

the pulley on the cross beam

 

 

 

 

(A) and then down again to the

 

 

inner pulley on the lifting beam.

 

 

Fit the crank rod through the

 

 

upper hole in the long leg and

 

 

through the bushing on the

 

 

middle flange.

 

 

Place the lifting line in the

17

 

locking collar recess. Thread

 

 

the collar bushing with the line

 

 

and the other collar bushing, on

 

 

the crank rod.(collars facing out)

 

 

Push the crank rod through until

 

 

app. 1/8” extends beyond the

 

 

outer saddle plate bushing.

 

 

Screw the locking screw

 

 

(M6x8)on the locking collars into

 

 

the recesses on the crank rod.

 

 

Then tighten the locking screw

 

 

(M8x8) that’s holding the lifting

 

 

line.

Assembly: edge support

18

A

14

(18)Slide the edge support onto the log bed.

(A)Attach crank handle to the crank rod. Insert an allen wrench into the end of the threads on the handle and tight it with an m8 locking nut.

Page 14
Image 14
Husqvarna M7 manual Assembly crank and lifting cable, Assembly edge support