Husqvarna PF 21, PR 17 Maintenance schedule, Daily, Weekly, At least, once a, before starting

Models: PR 17 PF 21 PR 17 AWD PF 21 AWD

1 52
Download 52 pages 20.14 Kb
Page 22
Image 22
Maintenance

Maintenance

Maintenance schedule

The following is a list of the maintenance which should be conducted on the machine. For those points not described in this manual, visit an authorised service workshop.

 

Daily

Weekly

At least

 

Maintenance

Maintenance

maintenance

once a

 

3)

 

 

 

 

 

 

before starting

maintenance

year

interval in hours

 

 

 

 

 

 

 

 

 

 

 

 

25

 

50

100

250

 

 

 

 

 

 

 

 

 

Cleaning

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check the engine’s oil level

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check the engine’s cooling air intake

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check the fuel pump air filter

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check the steering wires

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check the level of the battery acid

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check the safety system

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check nuts and screws

O

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check for fuel and oil leakage

O

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clean around the silencer

O

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Start engine and blades, listen for noise

O

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clean transmission air intake

X

 

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

Change engine oil 1)

 

 

X

 

 

X1)

X1)

 

Check the cutting deck

X

 

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

Checking the blades

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clean underside of cutting unit

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check the air pressure in the tyres, 60 kPa/8.5 PSI.

 

 

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

Lubricate belt tensioner (nipple)

 

X

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

Lubricate the driver’s seat

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lubricate all wires

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lubricate bearing surfaces on cutting unit

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clean inside frame tunnel

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lubricate the pedal system in the frame tunnel

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lubricate the hydrostatic cable with links

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check the parking brake

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lubricate the parking brake wire

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lubricate throttle control

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lubricate choke control

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lubricate the chain in the frame tunnel

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check steering chain inside frame tunnel

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check for damage to wire guide at articulated joint

 

O

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clean thoroughly around engine

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clean thoroughly around transmission

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check the V-belts

 

 

 

O

 

 

 

 

 

 

 

 

 

 

 

 

 

Check the cooling fins on the hydrostatic transmission

 

 

X

 

 

 

X

 

 

 

 

 

 

 

 

 

 

22 – English

Page 22
Image 22
Husqvarna PF 21 Maintenance schedule, Daily, Weekly, At least, once a, before starting, maintenance, interval in hours