2 Server Board Installation and Upgrades
Tools and Supplies Needed
•Phillips* (cross head) screwdriver (#1 bit and #2 bit)
•Jumper removal tool or needle nosed pliers
•Pen or pencil
•Antistatic wrist strap and conductive foam pad (recommended)
Before You Begin
Emissions Disclaimer
To ensure EMC compliance with your local regional rules and regulations, the final configuration of your end system product may require additional EMC compliance testing. For more information please contact your local Intel Representative.
See “Regulatory and Integration Information” on page 107 for product Safety and EMC regulatory compliance information. This is an FCC Class A device. Integration of it into a Class B chassis does not result in a Class B device.
Warnings and Cautions
These warnings and cautions apply throughout this chapter. Only a technically qualified person should configure the server board.
WARNING
Hazardous conditions, devices & cables: Hazardous electrical conditions may be present on power, telephone, and communication cables. Turn off the server and disconnect the power cord, telecommunications systems, networks, and modems attached to the server before opening it. Otherwise, personal injury or equipment damage can result.
Server Board Installation and Upgrades | 39 |