Intel S875WP1-E manual Server Board Installation and Upgrades, Tools and Supplies Needed

Models: S875WP1-E

1 112
Download 112 pages 32.08 Kb
Page 39
Image 39
2 Server Board Installation and Upgrades

2 Server Board Installation and Upgrades

Tools and Supplies Needed

Phillips* (cross head) screwdriver (#1 bit and #2 bit)

Jumper removal tool or needle nosed pliers

Pen or pencil

Antistatic wrist strap and conductive foam pad (recommended)

Before You Begin

Emissions Disclaimer

To ensure EMC compliance with your local regional rules and regulations, the final configuration of your end system product may require additional EMC compliance testing. For more information please contact your local Intel Representative.

See “Regulatory and Integration Information” on page 107 for product Safety and EMC regulatory compliance information. This is an FCC Class A device. Integration of it into a Class B chassis does not result in a Class B device.

Warnings and Cautions

These warnings and cautions apply throughout this chapter. Only a technically qualified person should configure the server board.

WARNING

Hazardous conditions, devices & cables: Hazardous electrical conditions may be present on power, telephone, and communication cables. Turn off the server and disconnect the power cord, telecommunications systems, networks, and modems attached to the server before opening it. Otherwise, personal injury or equipment damage can result.

Server Board Installation and Upgrades

39

Page 39
Image 39
Intel S875WP1-E Server Board Installation and Upgrades, Tools and Supplies Needed, Before You Begin, Warnings and Cautions