Jenn-Air W10274319E Installation Instructions, Electrical Requirements, Prepare Location

Models: W10274319E W10272061

1 28
Download 28 pages 2.83 Kb
Page 7
Image 7
Calculating Vent System Length

Calculating Vent System Length

To calculate the length of the system you need, add the equivalent feet (meters) for each vent piece used in the system.

Vent piece

8" (20.3 cm) round

45° elbow

2.5 ft

 

(0.8 m)

90° elbow

5.0 ft

 

(1.5 m)

Maximum equivalent vent length is 35 ft (10.7 m).

Example Vent System

90 elbow

 

 

 

 

 

 

Wall cap

 

 

6 ft (1.8 m)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2ft

(0.6 m)

The following example falls within the maximum vent length of 35 ft (10.7 m).

1

- 90° elbow

= 5.0 ft (1.5 m)

1

- wall cap

= 0.0 ft (0.0 m)

8 ft (2.4 m) straight

= 8.0 ft (2.4 m)

 

 

System length

= 13 ft (3.9 m)

Electrical Requirements

Observe all governing codes and ordinances.

Ensure that the electrical installation is adequate and in conformance with National Electrical Code, ANSI/NFPA 70 (latest edition), or CSA Standards C22.1-94, Canadian Electrical Code, Part 1 and C22.2 No. 0-M91 (latest edition) and all local codes and ordinances.

If codes permit and a separate ground wire is used, it is recommended that a qualified electrician determine that the ground path is adequate.

A copy of the above code standards can be obtained from:

National Fire Protection Association

One Batterymarch Park

Quincy, MA 02269

CSA International

8501 East Pleasant Valley Road

Cleveland, OH 44131-5575

A 120 Volt, 60 Hz., AC only, 15-amp, fused electrical circuit is required.

If the house has aluminum wiring, follow the procedure below:

1.Connect a section of solid copper wire to the pigtail leads.

2.Connect the aluminum wiring to the added section of copper wire using special connectors and/or tools designed and UL listed for joining copper to aluminum.

Follow the electrical connector manufacturer's recommended procedure. Aluminum/copper connection must conform with local codes and industry accepted wiring practices.

Wire sizes and connections must conform with the rating of the appliance as specified on the model/serial rating plate. The model/serial plate is located behind the filter on the rear wall of the range hood.

Wire sizes must conform to the requirements of the National Electrical Code, ANSI/NFPA 70 (latest edition), or CSA Standards C22. 1-94, Canadian Electrical Code, Part 1 and C22.2 No. 0-M91 (latest edition) and all local codes and ordinances.

INSTALLATION INSTRUCTIONS

Prepare Location

It is recommended that the vent system be installed before the range hood is installed.

Before making cutouts, make sure there is proper clearance within the ceiling for exhaust vent.

Range hood is to be installed 24" (61.0 cm) min. for electric cooking surfaces or 27" (68.6 cm) min. for gas cooking surfaces to suggested maximum of 36" (91.2 cm) above the cooking surface.

Check your ceiling height and the range hood height maximum before you select your hood.

1.Disconnect power.

2.Determine which venting method to use: roof, wall or non- vented.

3.Select a flat surface for assembling the range hood. Place covering over that surface.

Vent pieceWARNING

Excessive Weight Hazard

Use two or more people to move and install range hood.

Failure to do so can result in back or other injury.

4.Using 2 or more people, lift range hood onto covered surface.

7

Page 7
Image 7
Jenn-Air W10274319E Installation Instructions, Electrical Requirements, Prepare Location, Calculating Vent System Length