Kohler Electric Shower Screws, Cover, Screw Service Tunnel, Switch Assembly, Spade Connection

Models: Electric Shower

1 44
Download 44 pages 33.7 Kb
Page 33
Image 33
Screws

Flow Regulator Assembly/Switch Assembly- Removal and Installation

WARNING! Isolate the electrical and water supplies before removing the cover. Mains electricity connections are exposed when the cover is removed.

1.Remove the three cover retaining screws, the cover and the service tunnel.

2.Remove the hose from the outlet connector and loosen the connection to the inlet connector.

3.Remove the six screws that hold the switch assembly, heater tank, flow regulator assembly and inlet connector.

Screws

Shower

Cover

Screw

Service Tunnel

4.Remove all wiring from the spade connections on the switch assembly.

Note! Using long nose pliers, gently squeeze the lever lock and pull the spade connection off the switch assembly.

Switch Assembly

Spade Connection

Lever Lock

33

Page 33
Image 33
Kohler Electric Shower manual Screws, Cover, Screw Service Tunnel, Switch Assembly, Spade Connection, Lever Lock