Installation Requirements
Plumbing
1.The Mira Zest 7.5 kW and 8.5 kW electric showers are designed to operate with a minimum maintained inlet pressure of 0.7 bar up to a maximum static inlet pressure of 10 bar.
2.The appliance is normally connected to the cold water
3.The appliance is suitable for installation within the shower area. It is fitted with a pressure relief device and must be positioned over a water catchment area with the controls at a convenient height for the user. The shower fitting should be positioned so that it discharges down the centre line of the bath, or across the opening of a shower cubicle, and must be directed away from the appliance.
4.The appliance is fitted with an inlet connector assembly that is designed to accept plumbing supplies from the top or bottom. The water supply can be fed with 15 mm pipe or 10 mm microbore pipe, suitably adapted into the inlet connector assembly. If 10 mm microbore is used, then an allowance for increased pressure loss must be made to ensure that the minimum maintained inlet pressure is achieved.
5.Do not fit the appliance to the wall and tile up to the case. The appliance must be fitted onto a finished flat and even wall surface. Otherwise, difficulty may be encountered when fitting the cover, and subsequent operation of the unit could be impaired (small pillars moulded on to the back of the case allow air circulation).
6.Use only the inlet connector assembly supplied with the appliance. Do not use any other types of fitting.
7.Refrain from applying excessive force when making any connections. Always provide mechanical support when making the plumbing connections.
8.This appliance is not designed to be plumbed directly from the rear. For a rear- entry supply, add an elbow to the supply pipe and connect it as a rising or falling supply.
11