![](/images/new-backgrounds/1221228/22122849x1.webp)
Figure 18: Atmel – Flip Window (Connected)
7.Click Run.
After each stage in the operation is completed, the
When the operation is completed, all 4
and the status bar message: Memory Verify Pass appears:
If an error message: “Not Finished” shows, click Run again.
22 |