HEATINGSEQUENCECONTINUED

NORMALHEATINGMODEABNORMALHEATINGMODE

IPREPURGE

IPRESSURESWtTCHCLOSED?

GAS VALVE DE-ENERGIZED.

!11INDOOR BLOWER DE-ENERGIZED,(Seetop of previous page.)

L'WO'STAGE'OOEI S,N";L;'S_;_%T

COMBUSTION AIR INDUCER ON FOR 2.5 MINUTES,

 

CALLFOR 2ridSTAGE

 

2ridSTAGEON DELAY

 

 

HEAT(HIGHHEAT)

 

ON CONTROLBOARD

 

 

FROM THERMOSTAT

COMPLETE (B, 12 OR 15 MIN

 

I

INDOOR BLOWER ON

 

 

HIGH HEATING SPEED?

 

 

 

1

 

2.5

 

 

 

MINUTES

I COMBUSTION AIR BLOWER ON HIGH SPEED?

 

I

HIGH HEAT PRESSURE

SWITCH CLOSED?

I

 

YES

_

 

 

I

HIGH HEAT GAS VALVE OPEN? (8 SEC. DELAY)

_'NO

CONTROL CHECKS: FLAME PRESENCE, CLOSED I PRIMARY LIMIT, CLOSED PRESSURE SWITCHES, r

CONTINUOUSLY CLOSED ROLl.OUT SWITCH (dudng heating cycle).

SEE PREVIOUS SEQUENCES FOR FAILURE MODES.

DEMAND FOR HEAT SATISFIED.

I

THERMOSTAT OPENS.

GAS VALVE DE-ENERGIZED.

]

 

COMBUSTION

AIR BLOWER

I

POST-PURGE

- 5 SECONDS.

INDOOR BLOWER

J

SELECTED TIME OFF DELAY.

PRESSURESW,TC c

:_ _o

PRESSURE SWITCH WATCHGUARD

COMBUSTION AIR INDUCER

DE-ENERGIZED.

5-MINUTE DELAY

COMBUSTIONiNDUCER ONAIR. I

Page 30

Page 30
Image 30
Lennox International Inc G32Q3-100 Iprepurge, Combustion AIR Inducer on for 2.5 Minutes, Heathighheat On Controlboard