NOTE - G32 senes units must not be used as a construc- tion heater dunng any phase of construction. Very low re. turn air temperatures, harmful vapors and misplacement of the filters will damage the unit and lower its efficiency.
The G32Q is an upflow gas furnace. A changeover kit is necessary if the furnace is to be used with L.P. gas, These instructions are intended as a general guide and do not supersede Focal codes in any way. Consult authori- ties having jurisdiction before installation.
Shipping and Packing List 1 - Assembled G32 furnace
1 - 3 inch x 2 inch vent transition piece
1 - Bag assembly containing:
1 - Electrical
1 - Widng harness
1 - Snap bushing
2 - Filter clips
1 - Condensate plug
1 - Condensate drain adapter
1 - Brown accessory wire
1 - Green ground wire
4 - Wire nuts
2 - Star washers and screws
8 -
1 - Grounding label
1 - Wire tie
3 -
Shipping Damage
Check equipment for shipping damage. If you find any damage, immediately contact the last carrier.
I Insta!iatton' Setttng Equipment
Select a location that allows for required clearances listed on the unit rating plate. Also consider gas supply connec- tions, electrical supply, vent connection and installation
and service clearances [24 inches (610 mm) at unit front]. The furnace must be level.
NOTE - 1/3 and 1/2 hp blower motors are equipped with either four flexible mounting legs or three flexible legs and one ngid leg. The ngid leg is equipped with a shipping bolt and a flat white plastic washer (rather than the rubber mounting grommet used with a flexible mounting leg). This shipping bolt and flat washer must be removed be- fore the furnace is put into operation. Once the sh_pping bolt and washer are removed, the rigid leg will not touch the blower housing.
_ CAUTION
[ . WARNING I
WARNING
WARNING
Return air can be brought in eitherside or at the bottomof the unit.Scdbe linesshowthe outlineof each side and the
bottom return air opening.
Page 5