13

14

15

FCC label

Homologation label

Serial number label

Following labels need to be peeled off from the old base cover, and need to be put on the new base cover.

2

3

4

5

6

7

8

9

10

11

12

16

Information label

IMEI barcode label

Mac address label

Vodafone label

Israel label

Modem label (only for PRC models)

China wireless WAN label

Modem AMOM label (only for Brazil)

Bluetooth label (only for Brazil)

Wireless card label (only for Brazil)

SIRIM label

Asset tag

For some models, you also need to apply one or two FCC labels. Check the old base cover; if it has one or two FCC labels, find duplicates of them in the label kit and apply them to the new base cover.

For the location of each label, refer to the following figure:

1

2

3

4

16

 

 

 

15

 

 

 

14

 

 

 

13

 

 

 

5

12

11

10

9 8 7 6

1190 I/O sub card

Note: The I/O sub card contains a modem port, an Ethernet port, and a black or yellow USB port.

Chapter 9. Removing and replacing a FRU 99

Page 105
Image 105
Lenovo W510, T510I manual 1190 I/O sub card