Liebert 700-3000 VA user manual General Installation, MINI-TOWER/TOWER UPS Installations

Models: 700-3000 VA

1 28
Download 28 pages 39.76 Kb
Page 6
Image 6

GENERAL INSTALLATION

MINI-TOWER/TOWER UPS INSTALLATIONS

1.Unpack the UPS carefully noting the packing method. Retain the box and packing material for possible future shipment.

2.CAUTION: The UPS is heavy (see specifications). Take proper precautions when lifting or moving it.

3.Visually inspect the UPS for freight damage. Report damage to the carrier and your dealer.

4.Ensuring load equipment is turned off, plug all loads into the UPS output receptacles.

5.Plug the UPS into a dedicated wall receptacle properly protected by a circuit breaker or fuse in accordance with the National And Local Codes. Use a 15 amp rated device for the 700, 1000, or 1500 VA units, a 20 amp device for the 2000 VA unit, and a 30 amp device for the 3000 VA unit. The wall receptacle must be grounded.

6.Locate the UPS indoors in a controlled environment, where it cannot be accidentally disconnected. Locate it in an area with unrestricted air flow, away from water, flammable liquids, gases, corrosives, or conductive contaminants. Maintain a minimum of 4 inches (100 mm) clearance in front and rear of the UPS. Maintain an ambient temperature range of 32° to 104°

NOTE: UPS operation in temperatures above 77° F (25° C) reduces battery life.

7.Turn on the UPS by pressing the On button for at least one half second; then turn on the connected load equipment. The UPS is ready for normal operation.

Support

Base

Rack-Tower models are stabilized by the supplied support bases. See illustration for placement.

6

DISCONTINUED

PRODUCT

Page 6
Image 6
Liebert 700-3000 VA user manual General Installation, MINI-TOWER/TOWER UPS Installations