Power-Up Sequence

Power-Up Sequence

With the LDT-5525 Series Precision Temperature Controller connected to an AC power source, pressing the POWER switch will supply power to the instrument and start the power up sequence.

During the power-up sequence, the following takes place. For about two seconds all indicators light up, and all of the 7-segment displays indicate "8". Then all lamps are turned off for two seconds. Then, the sensor switch position is displayed for two seconds. After this, the unit is configured to the state it was in when the power was last shut off (except for the display mode which defaults to I TE measurement). The adjust knob is always disabled at power up.

Introduction to the LDT-5525 Front Panel

The LDT-5525 Temperature Controller's front panel contains displays and controls for the Temperature Controller hardware. Each of the labeled areas on the front panel (i.e. DISPLAY or MODE) is described in this chapter.

Refer to Figure 2.1 for the following discussions of the LDT-5525 Temperature Controller front panel sections. The key words are in capital letters for quick identification.

Error

Parameter

Display

Adjust

Adjust

Indicators

Switch

 

Switch

Enable

Knob

 

 

 

Switch

 

 

 

LDT-5525

TEMPERATURE CONTROLLER

 

 

A

k

C

DISPLAY ADJUST

ITE

SENSOR VIEW SET

PARAMETER

 

 

ILIMIT

ENBL

SENSOR OPEN

TE OPEN

T LIMIT

 

 

 

GAIN

 

ANALOG OUT

SENSOR CAL

MODE

OUTPUT

POWER

C1

I TE

 

100 C/V

 

C2

R

ON

10 k / V

 

T

 

100k/ V

AC POWER

Analog

CAL

Mode

Output

ON/Off

Output

Select

Select

On/Off

Switch

Connector

Switch

Switch

Switch

Figure 2.1 LDT-5525 Front Panel

8 LDT-5525