A-2 INSTALLATIONA-2
Read entire installation section before starting installation.
SAFETY PRECAUTIONS | 1 | 2 |
| ||
|
|
WARNING
ELECTRIC SHOCK can kill.
•Only qualified personnel should perform this installation.
•Only personnel that have read and under- stood the SP
•Machine must be plugged into a receptacle which is grounded per any national, local or other applicable electrical codes.
•The SP
IDENTIFY AND LOCATE
COMPONENTS
If you have not already done so, unpack the SP
1.SP
2.Gun and cable assembly(1)
3.Literature and miscellaneous including:
a)This operating manual
b)Contact tips:
SP |
| |
2 | 0 | .025” (0.6mm) for solid wire |
12 .030” (0.8mm) for solid wire
20 .035” (0.9mm) for cored wire
02 .045” (1.2mm) for cored or solid wire
c)5/64” (2.0 mm) Hex key wrench for removal of drive roll.
4.10 ft (3,0 m) work cable.
5.Work clamp.
6.14.0 ft (4.3 m) .19” (4.8 mm) dia. gas hose
7.2- Hose clamps
(1)The gun is ready to feed .030" (0.8mm) diameter wire.
SP
E
WELDING AMP RA
NGE
SP 170
4
3
6
5