Models 45,000 - 260,000 Btu/hr
SBR-I-SRev A
Save this manual for future reference
Hazard definitions
DANGER
Contents
What to do if you smell gas
Warranty
Please read before proceeding
Checking equipment
Codes
Please read before proceeding
Other Specifications
Ratings
Solution Boiler I=B=R Rating
Figure A High Altitude Label Location
The Solution - How it works
Models 45,000 - 90,000 Rear View
The Solution - How it works... continued
Models 45,000 - 90,000 Btu/hr Front View
Models 45,000 - 90,000 Right Side inside unit
Models 135,000 - 260,000 Btu/hr Rear View
The Solution - How it works
Models 135,000 - 260,000 Btu/hr Front View
10 17
1Determine boiler location
Location of unit
Figure 1-4 CombustionAir Through Ducts
1Determine boiler location
Figure 1-3 CombustionAir Direct from Outside
Figure 1-5 CombustionAir from Interior Space
1Determine boiler location continued
TABLE - 1B MINIMUM RECOMMENDED COMBUSTION
AIR SUPPLY TO EQUIPMENT ROOM
1Determine boiler location
2Venting
A Conventional Negative Draft Venting System
TABLE - 2A VENT PIPE SIZES
2Venting
Locate appliance as close as possible to a chimney or gas vent
Less from Ridge
Vertical Vent Termination Clearances
Figure 2-2 VentTermination from Peaked Roof 10 or
from Parapet Wall
TABLE - 2B VENT MATERIALS
Masonry Chimney Installation
Sidewall Venting - Negative Draft
Fan Assisted Venting
Automatic Vent Damper
Protection
Gas Pressure Test
3Gas connections
Gas Supply
Gas Connection
TABLE - 3E
3Gas connections continued
Gas Piping
Install Piping to Control
3Gas connections
Gas Manifold Pressure Adjustment Procedure
Figure 3-3 ManifoldPressure Adjustment
Figure 3-2 Wrench
Checking Gas Supply Pressure
3Gas connections continued
Figure 3-4 GasSupply Pressure
Venting of Combination Gas Valves
Combination Gas Valves
3Gas connections
Figure 3-5 M9Gas Valve
Relief Valve
Water Flow Switch if equipped
4Water connections
Figure 4-2 WaterFlow Switch - Top Connections
TABLE - 4A MINIMUM REQUIRED FLOW
Typical Heating Boiler Installations
Low Water Cutoff if equipped
FOR HEATING BOILER
TABLE - 4B SYSTEM TEMPERATURE RISE CHART
4Water connections continued
Piping of the Boiler System
Based on Boiler Output in Btu/hr
Circulator Pump Requirements
TABLE - 4C HEAT EXCHANGER PRESSURE DROP CHART
Water Connections
4Water connections
Circulator Pump Operation
Circulator Pump Specifications
Primary/Secondary Boiler Piping
PERFORMANCE LOOP
Low Temperature Bypass Requirements
Primary/Secondary Boiler Piping continued
Full Flow Application
Boiler Flow Rates
4Water connections continued
Primary / Secondary Piping
SOLUTION BOILER
MAKE UP WATER
Primary / Secondary Piping
SOLUTION BOILER
4Water connections
MAKE UP WATER
Figure 4-6 MultipleBoilers Zoned with Circulators
4Water connections continued
Primary / Secondary Piping
ZONE #1
4Water connections
Full System Flow
SOLUTION BOILER
Figure 4-7 SingleBoiler Full System Flow
Full System Flow
SOLUTION BOILER
4Water connections continued
MAKE UP WATER
Boiler Operating Temperature Control
5Electrical connections
TABLE - 5A TERMINAL STRIP WIRING
Auxiliary Device Connection to Terminal Strip
Temperature Control Settings
Temperature Adjustment
Pump Wiring for a Heating Boiler
5Electrical connections continued
5Electrical connections
TABLE - 5C MAXIMUM SET POINT DETERMINATION
Maximum Set Point Determination
Set Point
Figure 5-4 Installationof Remote Sensors
Wiring of Remote Sensors
Installation of Remote Sensors
5Electrical connections continued
Figure 5-5 OptionalOutdoor Air Reset Control
Outdoor Air Reset Option
Additional Temperature Controls
Figure 5-6 OutdoorAir Control Example Chart
5Electrical connections continued
Figure 5-7 BlockedVent Switch Location
BLOCKED VENT SWITCH INVERTED TO SHOW RESET
UNDERNEATH DRAFT HOOD
6Start-up
FOR YOUR SAFETY READ BEFORE OPERATING
Pre-startChecklist
Initial Start-up
Operating Instructions
To Turn Off Gas to Appliance
Water Treatment
Intermittent Pilot Spark Ignition System
Freeze Protection
Ignition and Control Timings
Owner maintenance
7Maintenance Maintenance and annual startup
Service technician
see the following pages for instructions
Flue vent system and air supply
7Maintenance
Address reported problems
Inspect appliance area
7Maintenance continued
Check Expansion Tank
Check Relief Valve
Heat Exchanger / Burner Access
Check All Wiring
Check Control Settings
Perform Start-upand Checks
Inspection and Cleaning
7Maintenance continued
Breathing Fresh air
Gas Train and Controls
Review with owner
Inspection of Heat Exchanger Waterways
Water Circulating Pump
Step
8Troubleshooting
Troubleshooting Guide M9 Solution Boilers
Step
Wiring Diagram - M9
9 Diagrams
Schematic Diagram - M9 Unit
45,000 - 260,000 Btu/hr Models
Page
Revision A ECO #C03746 initial release
SBR-I-SRev A 5/10