Save this manual for future reference
Models 45,000 - 260,000 Btu/hr
SBR-I-SRev A
Contents
Hazard definitions
DANGER
Warranty
Please read before proceeding
What to do if you smell gas
Checking equipment
Codes
Please read before proceeding
Ratings
Solution Boiler I=B=R Rating
Other Specifications
Figure A High Altitude Label Location
The Solution - How it works
The Solution - How it works... continued
Models 45,000 - 90,000 Btu/hr Front View
Models 45,000 - 90,000 Rear View
Models 45,000 - 90,000 Right Side inside unit
The Solution - How it works
Models 135,000 - 260,000 Btu/hr Front View
Models 135,000 - 260,000 Btu/hr Rear View
10 17
1Determine boiler location
Location of unit
1Determine boiler location
Figure 1-3 CombustionAir Direct from Outside
Figure 1-4 CombustionAir Through Ducts
Figure 1-5 CombustionAir from Interior Space
1Determine boiler location continued
1Determine boiler location
TABLE - 1B MINIMUM RECOMMENDED COMBUSTION
AIR SUPPLY TO EQUIPMENT ROOM
TABLE - 2A VENT PIPE SIZES
2Venting
A Conventional Negative Draft Venting System
2Venting
Locate appliance as close as possible to a chimney or gas vent
Vertical Vent Termination Clearances
Figure 2-2 VentTermination from Peaked Roof 10 or
Less from Ridge
from Parapet Wall
Masonry Chimney Installation
Sidewall Venting - Negative Draft
TABLE - 2B VENT MATERIALS
Fan Assisted Venting
Automatic Vent Damper
Protection
3Gas connections
Gas Supply
Gas Pressure Test
Gas Connection
3Gas connections continued
Gas Piping
TABLE - 3E
Install Piping to Control
Gas Manifold Pressure Adjustment Procedure
Figure 3-3 ManifoldPressure Adjustment
3Gas connections
Figure 3-2 Wrench
Figure 3-4 GasSupply Pressure
Checking Gas Supply Pressure
3Gas connections continued
Combination Gas Valves
3Gas connections
Venting of Combination Gas Valves
Figure 3-5 M9Gas Valve
Water Flow Switch if equipped
4Water connections
Relief Valve
Figure 4-2 WaterFlow Switch - Top Connections
Typical Heating Boiler Installations
Low Water Cutoff if equipped
TABLE - 4A MINIMUM REQUIRED FLOW
FOR HEATING BOILER
TABLE - 4B SYSTEM TEMPERATURE RISE CHART
4Water connections continued
Piping of the Boiler System
Based on Boiler Output in Btu/hr
TABLE - 4C HEAT EXCHANGER PRESSURE DROP CHART
Water Connections
Circulator Pump Requirements
4Water connections
Circulator Pump Specifications
Primary/Secondary Boiler Piping
Circulator Pump Operation
PERFORMANCE LOOP
Low Temperature Bypass Requirements
Primary/Secondary Boiler Piping continued
Full Flow Application
Boiler Flow Rates
Primary / Secondary Piping
SOLUTION BOILER
4Water connections continued
MAKE UP WATER
LOW TEMPERATURE BYPASS
SOLUTION BOILER
4Water connections
Primary / Secondary Piping
4Water connections continued
Primary / Secondary Piping
Figure 4-6 MultipleBoilers Zoned with Circulators
ZONE #1
Full System Flow
SOLUTION BOILER
4Water connections
Figure 4-7 SingleBoiler Full System Flow
SOLUTION BOILER
4Water connections continued
Full System Flow
MAKE UP WATER
5Electrical connections
TABLE - 5A TERMINAL STRIP WIRING
Boiler Operating Temperature Control
Auxiliary Device Connection to Terminal Strip
Temperature Adjustment
Pump Wiring for a Heating Boiler
Operating Temperature Control
Locating Temperature Control
TABLE - 5C MAXIMUM SET POINT DETERMINATION
Maximum Set Point Determination
Temperature Control Sensors
Inlet Water Temperature Sensor
Outdoor Air Temperature Sensor
Wiring of Remote Sensors
Installation of Remote Sensors
Figure 5-4 Installationof Remote Sensors
Outdoor Air Reset Option
Additional Temperature Controls
Figure 5-5 OptionalOutdoor Air Reset Control
Figure 5-6 OutdoorAir Control Example Chart
Figure 5-7 BlockedVent Switch Location
BLOCKED VENT SWITCH INVERTED TO SHOW RESET
5Electrical connections continued
UNDERNEATH DRAFT HOOD
FOR YOUR SAFETY READ BEFORE OPERATING
Pre-startChecklist
6Start-up
Initial Start-up
Operating Instructions
To Turn Off Gas to Appliance
Intermittent Pilot Spark Ignition System
Freeze Protection
Water Treatment
Ignition and Control Timings
7Maintenance Maintenance and annual startup
Service technician
Owner maintenance
see the following pages for instructions
7Maintenance
Address reported problems
Flue vent system and air supply
Inspect appliance area
Check Relief Valve
7Maintenance continued
Check Expansion Tank
Check All Wiring
Check Control Settings
Heat Exchanger / Burner Access
Perform Start-upand Checks
Breathing Fresh air
Inspection and Cleaning
7Maintenance continued
Review with owner
Inspection of Heat Exchanger Waterways
Gas Train and Controls
Water Circulating Pump
8Troubleshooting
Troubleshooting Guide M9 Solution Boilers
Step
Step
9 Diagrams
Schematic Diagram - M9 Unit
Wiring Diagram - M9
45,000 - 260,000 Btu/hr Models
Page
Revision A ECO #C03746 initial release
SBR-I-SRev A 5/10