Lopi 6Installation, Before You Begin, Packing List, Installation Options, Minimum Fireplace Size

Models: Masonry Fireplace Factory Built (Metal) Fireplace Mobile Home Model: Pioneer Bay (Heritage Bay PI)

1 38
Download 38 pages 13.05 Kb
Page 8
Image 8
6Installation

6Installation

Before You Begin

READ THIS ENTIRE MANUAL BEFORE YOU INSTALL AND USE THIS HEATER. FAILURE TO FOLLOW THE INSTRUCTIONS MAY RESULT IN PROPERTY DAMAGE, BODILY INJURY, OR EVEN DEATH.

Check with local building officials for any permits required for installation of this pellet heater and notify your insurance company before proceeding with installation.

Packing List

• Avanti Insert • Manual • Door Latch Tool • Fuses (2) • Leveling Bolts (2) • Brush

Installation Options:

Masonry Fireplace Factory Built (Metal) Fireplace • Outside Air Compatible

Planning The Installation

HINT:

Have an authorized Travis Industries dealer install this heater. If you install the heater

 

yourself, have your dealer review your installation plans.

HINT:

Place the heater outside and load 10 pounds of pellets inside the hopper. Plug the

 

heater in and let it run on HIGH until the pellets run out. This will cure the paint and burn

 

off any oil on the steel, eliminating any smell inside the home.

HINT:

Paint the interior of the fireplace with latex paint to prevent fireplace odors from entering

 

the home (the convection blower circulates air around the insert).

Minimum Fireplace Size

 

Mantel

Min. 35"

(combustible or non-combustible)

(13" from

 

hopper lid)

 

Min. 34-1/8"

(6" from hopper

Min. 32"lid) (10" from

hopper lid)

Min. 19-5/8"

Non-Combustible

Facing

Min. 30"

Min. 15-1/2" Before You Begin (includes circuit board)

(6" from hopper lid) Packing ListInstallation Options: Min. 16-5/8"

(includes 5"

for vent)

Min. 34-1/8"

(6" from hopper lid)

Non-Combustible Hearth

Travis Industries

4 0 5 1 2 1 6

9 3 5 0 8 0 5 1

Page 8
Image 8
Lopi Masonry Fireplace Factory Built (Metal) Fireplace Mobile Home Model: Pioneer Bay (Heritage Bay PI) 6Installation