P 13/ 20
Repair
[3] DISASSEMBLY/ASSEMBLY
[3]-4. Bearing box section, Crank housing section (cont.)
ASSEMBLING
(2)Assemble Piston together with Connecting rod to Crank shaft. Refer to the right illustration in Fig. 25.
(3)Assemble Bearing box complete as illustrated in Figs. 29 to 31.
Fig. 29
Ball bearing 608ZZ
Bearing box complete
Retaining ring
Assemble Ball bearing 608ZZ to Bearing box.
And secure the Ball bearing with Retaining ring
Fig. 30
Insert Needle bearing 1613 and Shoulder washer 8 over Counter shaft. Assemble Counter shaft to Bearing box complete by pressing down with arbor press.
Brim portion Shoulder washer 8
Needle bearing 1613
Counter shaft
Bearing box Complete
When assembling Shoulder washer 8,
face the brim portion to Needle bearing side.
Fig. 31
Counter shaft | Retaining | |
ring | ||
|
Turning Bearing box complete, mount Retaining ring
The assembled Bearing box complete is ready to be mounted to Crank housing complete in the next step.