24.Fix the Screw. <N7>
25.Attach the TOP Screws.
TOP Screw Sheet
<N7>
Connector (CN17)
Note:
Connector (CN27)
Tighten the Screws in the numbered order (No1 to No8). Tighten the Screws in the numbered order (No1 to No6).
Screws <N5>: DRQT26+D4FKL
Screws <N7>: DRSB26+10HKL
Screws <N11>: DFHE5025XA
Screws <N16>: DRQT26+E5FKL
Screws <N17>: DRQT26+E6FKL
Screws <N18>: DRSB26+8FKL
Screws <N21>: DXQT2+E12FNL