2. Installation

2.1 Unpacking and contents check

40

42

41

4344

45

47

49

 

48

46

(40)Pulsar MX 4000 or 5000 UPS.

(41)Two sets of tower stands.

(42)RS232 communications cable

(43)Product documentation.

(44)4 cable lockers.

(45)Telescopic rails for rack enclosure with mounting hardware (optional, or standard with NetPack version).

(46)Screw driver.

(47)Solution-Pacpower management suite CD-ROM.

(48)Network Management card (optional, or standard in NetPack version).

(49)4 IEC 10A output cables.

Packaging must be destroyed according to waste management standards. Recycling icons are displayed for easy selection.

A dangerous voltage is present inside the power module and the battery module. Any operations to be carried out on these modules must be done so by qualified staff.

2.2 Internal battery connection (Battery start-up)

1 - Remove the two fixing screws (59) to free the battery connector.

2 - Push the battery connector so that you can read "Connected".

3 - Secure the two fixing screws (59).

59

60

34008030EN/AA - Page 12

Page 12
Image 12
MGE UPS Systems 4000 RT Installation, Unpacking and contents check, Internal battery connection Battery start-up