2. Installation

2.3 Installation in tower position

Follow steps 1 to 3 to adjust the tower stands for the upright position.

1

1

150 mm

2

3 3

3

2

3

450 mm

Always keep 150 mm free space behind the UPS rear panel. The distance between the tower stands should be 450 mm.

34008030EN/AA - Page 13

Page 13
Image 13
MGE UPS Systems 4000 RT user manual Installation in tower position