2. Installation

2.8 Connection of IEC cables to output receptacles

2

44

49

1

3

1 - Connect the equipments to the UPS using the cables (49).

It is preferable to connect the priority equipments to the four outlets (2) and the non priority equipments to the four outlets (1) that can be programmed in pairs (1 and 2). Connect any high-power devices to the 16 A outlet (3)

To program shutdown of outlets (2) during operation on battery power and thus optimise the available backup time, the MGE UPS SYSTEMS communication software is required.

2 - Fit the connection securing system (44) that prevents the plugs from being pulled out accidentally.

34008030EN/AA - Page 20

Page 20
Image 20
MGE UPS Systems 4000 RT user manual Connection of IEC cables to output receptacles