Installation
Please refer to the Installation diag-
ram supplied with the machine.
The machine must be installed cor-
rectly and levelled.
Any unevenness in the floor level can
be compensated by adjusting the
screw feet on the right and left hand
sides at the front of the machine.
The service panel must first be lifted off
and the cover plate must be un-
screwed (see under "Electrical Connec-
tion").
When the screw feet are screwed in,
the disinfector can be moved back-
wards or forwards on its rollers.
The machine can be installed in the fol-
lowing ways:
Free-standing *)
Slot-in or at the end of a row: *)
The machine can be installed adjacent
to other equipment or furniture or in a
recess at least 90 cm wide and 70 cm
deep.
*) A machine lid is essential with this
type of installation (available as a spe-
cial accessory).
Building uner:
The machine should be positioned
under a continuous worktop. The niche
dimensions must be at least 90 cm
wide, 70 cm deep and 82 cm high.
Important for machines with DHK
steam condensor:
To avoid steam damage to the worktop
the self-adhesive protective sheet sup-
plied (25 x 58 cm) should be stuck
under the worktop in the area of the
condensor.
Position and secure the machine
To guarantee stability the machine
must first be aligned and then screwed
to the worktop.
Installation
35