Installation

Please refer to the Installation diag- ram supplied with the machine.

The machine must be installed cor- rectly and levelled.

Any unevenness in the floor level can be compensated by adjusting the screw feet on the right and left hand sides at the front of the machine.

The service panel must first be lifted off and the cover plate must be un- screwed (see under "Electrical Connec- tion").

When the screw feet are screwed in, the disinfector can be moved back- wards or forwards on its rollers.

The machine can be installed in the fol- lowing ways:

Free-standing *)

Slot-in or at the end of a row: *)

The machine can be installed adjacent to other equipment or furniture or in a recess at least 90 cm wide and 70 cm deep.

*) A machine lid is essential with this type of installation (available as a spe- cial accessory).

Building uner:

The machine should be positioned under a continuous worktop. The niche dimensions must be at least 90 cm wide, 70 cm deep and 82 cm high.

Important for machines with DHK steam condensor:

To avoid steam damage to the worktop the self-adhesive protective sheet sup- plied (25 x 58 cm) should be stuck under the worktop in the area of the condensor.

Position and secure the machine

To guarantee stability the machine must first be aligned and then screwed to the worktop.

35

Page 39
Image 39
Miele G 7783 CD Installation, Important for machines with DHK steam condensor, Position and secure the machine