Building-in
1.Make the
2.Attach the sealing strip to the underside of the hob and the aeration profile.
3.* Connect the pressure regulator supplied at |
| |
| the |
|
| positioned correctly. (See also |
|
| “Gas Connection”.) |
|
|
| glass shield |
4. | Place the hob in the | sealing tape |
| ||
| air inlets at the back of the hob are clear. | worktop |
|
| |
5. | Secure the hob in position. The brackets | wooden block |
|
| |
| clamp underneath the work surface. |
|
|
| burner box |
6. | Make the gas connection. Check the gas |
|
| connections with a soapy solution. |
|
7. | Put the plug in the socket (see "Electrical |
|
| Connection"). |
|
8. | Test to check that the hob is operational. |
|
* Undertray is positioned on work surface.
17