Miller Electric Big Blue 600D Installation, Installing Welding Generator, Connecting The Battery

Models: Big Blue 600D

1 60
Download 60 pages 53.61 Kb
Page 17
Image 17

SECTION 4 – INSTALLATION

4-1. Installing Welding Generator

Movement

YDo Not Lift Unit From End

Airflow Clearance

18in

(460 mm)

Location

18 in

18 in

(460 mm)

OR

(460 mm)

18 in

18 in

(460 mm)

(460 mm)

 

OR

Grounding

 

 

 

Y Always

securely

fasten

 

 

 

 

 

welding

generator

onto

 

 

 

 

 

transport vehicle

or

trailer

 

 

1

2

 

and comply with all DOT and

 

 

 

 

other applicable codes.

 

GND/PE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Y Always

ground

generator

 

 

 

 

 

frame to vehicle frame to pre-

 

 

 

 

 

vent electric shock and static

 

 

 

 

 

electricity hazards.

 

 

 

 

 

Y If unit does not have GFCI re-

 

 

 

 

 

ceptacles,

use

 

GFCI-

 

 

 

 

 

protected extension cord.

Electrically bond generator frame to

 

 

1

Equipment Grounding

 

vehicle frame

by metal-to-metal

 

 

 

 

 

 

Terminal (On Front Panel)

contact.

 

 

3

 

 

 

2

Grounding Cable (Not

 

 

 

 

 

 

 

 

 

 

 

Supplied)

 

 

 

 

 

 

 

 

3

Metal Vehicle Frame

 

 

 

 

 

Connect cable

from

equipment

 

 

 

 

ground terminal to metal vehicle

 

 

 

 

frame. Use #10 AWG or larger

 

 

 

 

insulated copper wire.

 

 

install1 7/02 – Ref. ST-800 652 / Ref. ST-800 477-A / ST-158 936-A / S-0854

4-2. Connecting The Battery

YConnect Negative (–)

OFF

Cable Last.

+

RUN

START

Tools Needed:

1/2 in

ST-153 654-B / Ref. SD-131 784-A / Ref. S-0756-B

OM-481 Page 13

Page 17
Image 17
Miller Electric Big Blue 600D manual Installation, Installing Welding Generator, Connecting The Battery