![](/images/new-backgrounds/1261282/26128239x1.webp)
4-3. Duty Cycle And Overheating
Duty Cycle is percentage of 10 min- utes that unit can weld at rated load without overheating.
If unit overheats, output stops, and cooling fan runs. Wait fifteen min- utes for unit to cool. Reduce amper- age or duty cycle before welding.
Y Exceeding duty cycle can damage unit and void warranty.
90 A @ 100% Duty Cycle For 115 Volt
125 A @ 100% Duty Cycle For 115 Volt
150 A @ 60% Duty Cycle For Stick Process (Other Voltages)
175 A @ 60% Duty Cycle For TIG Process (Other Voltages)
6 Minutes Welding | 4 Minutes Resting |
Overheating
0 | A or V |
| 15 |
| OR |
Minutes | Reduce Duty Cycle |
|
189