Moxa Technologies 5600 user manual Connecting the Hardware, Wiring Requirements, Getting Started

Models: 5600

1 93
Download 93 pages 41.98 Kb
Page 11
Image 11
Connecting the Hardware

NPort 5600 Series User’s Manual

Getting Started

Connecting the Hardware

This section describes how to connect NPort 5600 Series to serial devices for first time testing purposes. We cover Wiring Requirements, Connecting NPort 5610/30-16/8’s Power, Connecting NPort 5610-16/8-48V’s Power, Grounding NPort 561-16/8-48V, Connecting to the Network, Connecting to a Serial Device, and LED Indicators.

Wiring Requirements

Safety First!

Be sure to disconnect the power cord before installing and/or wiring your NPort 5600.

Wiring Caution!

Calculate the maximum possible current in each power wire and common wire. Observe all electrical codes dictating the maximum current allowable for each wire size.

If the current goes above the maximum ratings, the wiring could overheat, causing serious damage to your equipment.

Temperature Caution!

Please take care when handling NPort 5600. When plugged in, NPort 5600’s internal components generate heat, and consequently the casing may feel hot to the touch.

You should also pay attention to the following points:

zUse separate paths to route wiring for power and devices. If power wiring and device wiring paths must cross, make sure the wires are perpendicular at the intersection point.

NOTE: Do not run signal or communication wiring and power wiring in the same wire conduit. To avoid interference, wires with different signal characteristics should be routed separately.

zYou can use the type of signal transmitted through a wire to determine which wires should be kept separate. The rule of thumb is that wiring that shares similar electrical characteristics can be bundled together.

zKeep input wiring and output wiring separate.

zWhere necessary, it is strongly advised that you label wiring to all devices in the system.

Connecting NPort 5610/30-16/8’s Power

Connect NPort 5610/30-16/8’s 100-240 VAC power line with its AC connector. If the power is properly supplied, the “Ready” LED will show a solid red color until the system is ready, at which time the “Ready” LED will change to a green color.

2-3

Page 11
Image 11
Moxa Technologies 5600 Connecting the Hardware, Wiring Requirements, Connecting NPort 5610/30-16/8’s Power, Safety First