Moyer Diebel MH-6LM5 Initial Start-Up, Complete the installation, Install the Scrap Screens

Models: MH-60M5 MH-6LM5 MH-6NM5

1 76
Download 76 pages 62.65 Kb
Page 19
Image 19
INITIAL START-UP

INITIAL START-UP

INITIAL START-UP

Complete the installation

After plumbing and electrical connections are made, follow the steps below to complete the installation of your dishwasher.

1.Remove the white protective covering from the exterior of the machine.

2.Remove any foreign material from inside the machine.

3.Make sure dishwasher power switch is off.

4.Turn main water supply on.

5.Turn main power on at the main power service disconnect switch.

1

 

 

 

 

Install the Scrap Screens

 

 

 

 

and Drain-Overflow Assembly

 

 

 

 

Install scrap screens.

 

 

 

 

Make sure rubber stopper is secure on the

 

 

 

 

drain-overflow assembly.

 

 

 

 

Make sure the drain-overflow

 

 

 

 

seats securely in the tank bottom.

 

 

 

 

MAKE SURE DOORS

 

 

 

 

ARE FULLY CLOSED.

 

 

 

 

2

 

POWER

B

EXTENDED WASH

 

 

 

 

 

 

 

CYCLE

The controls are located

A

 

 

D

on the front of the dishwasher.

 

 

 

 

 

 

 

A-

On/Off power switch

 

OFF

 

 

B-

Power indicator Light

 

WASH

C

RINSE PRESSURE

C-

In-cycle light

 

 

 

D- Extended wash switch

 

 

 

 

E- Wash water temperature gauge

 

 

 

 

F- Final rinse pressure gauge

 

 

 

 

 

 

E

 

 

F

 

 

 

 

 

11

Page 19
Image 19
Moyer Diebel MH-6LM5 Initial Start-Up, Complete the installation, Install the Scrap Screens, and Drain-Overflow Assembly