Multiquip DCA-500SSK Rules For Safe Operation, Transporting, Emergencies, Maintenance Safety

Models: DCA-500SSK

1 114
Download 114 pages 57.54 Kb
Page 9
Image 9
Transporting

Transporting

Always shutdown engine before transporting.

Tighten fuel tank cap securely.

Drain fuel when transporting generator over long distances or bad roads.

Always tie-down the generator during transportation by securing the generator.

If generator is mounted on a trailer, make sure trailer complies with all local and state safety transportation laws. See page 10 for basic towing procedures.

Emergencies

Always know the location of the nearest fire extinguisher and first aid kit. Know the location of the nearest telephone. Also know the phone numbers of the nearest ambulance, doctor and fire department.

RULES FOR SAFE OPERATION

Maintenance Safety

NEVER lubricate components or attempt service on a running machine.

Always allow the machine a proper amount of time to cool before servicing.

Keep the machinery in proper running condition.

Fix damage to the machine immediately and always replace broken parts.

Dispose of hazardous waste properly.Examples of potentially hazardous waste are used motor oil, fuel, and fuel filters.

DO NOT use plastic containers to dispose of hazardous waste.

DO NOT pour waste, oil or fuel directly onto the ground, down a drain or into any water source.

DCA-500SSK — PARTS AND OPERATION MANUAL (STD)— REV. #1 (04/14/01) — PAGE 9

Page 9
Image 9
Multiquip DCA-500SSK operation manual Rules For Safe Operation, Transporting, Emergencies, Maintenance Safety