Starting the Engine

Starting the Enginemast operation NOTICE

Refer to the accompanying DCA25SSIU3 generator operation and parts manual (Part Number 49810) for information on how to start the engine.

mast operation

DANGER

ALWAYS make sure the area above

PULL PIN TO

RELEASE

OUTRIGGER

Outriggers and Support StandsFigure 6. Deploying OutriggersDeploying the Mast to Vertical Position PULL OUTRIGGER

light tower is open and clear of overhead power lines and other obstructions. The tower extends

OUTRIGGER Manual background

TO EXTEND

ROTATE Manual backgroundManual background JACKSTAND Manual backgroundManual background TO PLACE

in excess of 30 feet (9 meters). Contact with overhead power lines or other obstructions could result in equipment damage, serious injury or death!

DANGER

DO NOT stand behind the trailer while the mast is being raised or lowered. Serious injury could result if the mast falls down.

Outriggers and Support Stands

See Figure 6 for location of components.

1.Make sure both outriggers are extended.To extend the outriggers, pull the locking pin on the outrigger and hold while sliding out the outrigger assembly.

IN SUPPORT

POSITION Manual background

JACKSTAND

Figure 6. Deploying Outriggers

2.As soon as the pin clears the travel position hole, release it and continue sliding out the outrigger. The pin must snap into the outrigger locking hole in the extended position.

3.After extending all outriggers, rotate all trailer jack stands into the foot down position, then turn the crank handle on the jackstands clockwise to lower it and level the light tower.

4.Check behind the light tower and make sure all personnel and objects are clear of the mast.

Deploying the Mast to Vertical Position

Refer to Figure 7 for the location of components:

1.To release the mast from the mast cradle support, pull the retaining pin out of the cradle lock/release pin. Pull the cradle lock/release pin. This will unlock the mast from the horizontal position.

2.Remove the mast lock/release pin before raising tower to the vertical position.

3.To place the mast in the vertical position, turn the vertical mast winch hand lever clockwise until the mast is pointing upwards at 90 degrees.

4.Once the mast is in the vertical position, insert the mast lock/release pin to prevent the mast from falling.