![](/images/new-backgrounds/1041925/4192597x1.webp)
ST-45 PUMP — MAINTENANCE (PUMP)
SETTING PRESSURE INTHE ACCUMULATOR CIRCUIT
1.Attach a 3000 PSI test gauge (Mayco P/N 98016) to port G2 of the main manifold block (Figure 49).
3000 PSI
PRESSURE TEST GAUGE
P/N: 98016
4.Loosen the lock nut for the the accumulator circuit pilot relief valve cartridge (Figure 51), located at port G4.Using an allen wrench, turn the adjusting screw until pressure gauge reads 1950 PSI and tighten lock nut. Turn the engine off and on several times to make the pressure continues to read 1950 PSI.
PILOT RELIEF
ADJUSTMENTVALVE CARTRIDGE SCREW
LOCK NUT
Figure 51. Pilot Relief Valve Cartridge Adjustment
Figure 49. Accumulator Circuit PressureTest Gauge
2.Loosen the lock nut on the unloading valve cartridge (Figure 50) and using an allen wrench, turn the adjusting screw clockwise until it is completely closed.
5.Turn the unloading valve cartridge adjusting screw
6.Tighten the lock nut on the unloading valve cartridge.Your accumulator circuit pressure should now be properly adjusted.
ADJUSTMENT
SCREW
UNLOADING
VALVE CARTRIDGE
LOCK NUT
Figure 50. Unloading Valve Cartridge Adjustment
3.Turn the pump control switch (Figure 22) to the “ON” position and run engine at 2550 RPM.
MAYCO