NEC 120Mf Installing Internal Optional Devices, Preparing For Installation And Removal, Chapter

Models: 120Mf 5800

1 68
Download 68 pages 4.64 Kb
Page 39
Image 39
Installing Internal Optional Devices

Chapter 6

Installing Internal Optional Devices

PREPARING FOR INSTALLATION AND REMOVAL

Follow the procedure below to prepare for installing or removing components.

a.Shut down the OS.

b.Press the POWER switch to power off the NEC Express server (the POWER lamp goes off).

c.Unplug the power cord of the NEC Express server from a power outlet.

The power cord appended to the server as standard.

The power cord appended to the extension power unit.

d.Remove all cables from the rear of the NEC Express server.

e.A clearance of one to two meters must be provided around and over the NEC Express server.

Page 39
Image 39
NEC 120Mf, 5800 manual Installing Internal Optional Devices, Preparing For Installation And Removal, Chapter