
UNPACKING AND INSTALLATION
This chapter provides unpacking and installation information for the Switch.
Unpacking
Open the shipping cartons of the Switch and carefully unpacks its contents. The carton should contain the following items:
•One NP2500
•One AC power cord, suitable for your area’s electrical power connections
•Four rubber feet to be used for shock cushioning
•Screws and two mounting brackets
•
If any item is found missing or damaged, please contact NetComm immediately.
Installation
The site where you install the hub stack may greatly affect its performance. When installing, consider the following pointers:
•Install the Switch in a fairly cool and dry place. See Technical Specifications for the acceptable tempera- ture and humidity operating ranges.
•Install the Switch in a site free from strong electromagnetic field generators (such as motors), vibration, dust, and direct exposure to sunlight.
•Leave at least 10cm of space at the front and rear of the hub for ventilation.
•Install the Switch on a sturdy, level surface that can support its weight, or in an EIA
•When installing the Switch on a level surface, attach the rubber feet to the bottom of each device. The rubber feet cushion the hub and protect the hub case from scratching.
8 | NP2500 |
| YML842 Rev1 |