4-1
v1.0, March 2010
Chapter 4 Installation
This chapter describes the installation procedures for your NETGEAR GS110TP Smart PoE
Switch. Switch installation involves the following steps:
Step 1: Preparing the Site
Step 2: Installing the Switch
Step 3: Checking the Installation
Step 4: Connecting Devices to the Switch
Step 5: Applying AC Power
Step 6: Managing the Switch using a Web Browser or the PC Utility

Step 1: Preparing the Site

Before you install the switch, ensure the operating environment meets the site requirements in the
following table.
Table 4-1. Site Requirements
Characteristics Requirements
Mounting Desktop installations - Provide a flat table or shelf surface.
Wall-mount installations - Wall-mount: select a location. You also need the mounting
screws supplied with your switch.
Access Locate the switch in a position that allows access to the front panel RJ-45 ports, view the
front panel LEDs, and access the power connector.