
23.Wrap the Press Cable (101) around a 115mm Pulley (54). Attach the Pulley to the bracket on the Press Upright (16) with an M10 x 45mm Bolt (86) and an M10 Nylon Locknut (93).
24.Wrap the Press Cable (101) up around a 115mm Pulley (54). Attached the Pulley to the bracket on the Press Frame (12) with the M10 x 70mm Bolt (not shown) used in step 22, and an M10 Nylon Locknut (93).
Attach the end of the Press Cable (101) to the indicated bracket on the Press Upright (16) with an M10 x 25mm Short Thread Bolt (105) and an M10 Nylon Locknut (93).
25.Locate the High Cable (100). Route the end of the Cable without the ball up through the Press Top Frame (13).
Wrap the High Cable (100) around a 115mm Pulley (54). Attach the Pulley inside the Press Top Frame (13) with an M10 x 65mm Bolt (88), two M10 Washers (89), two 15mm x 12mm Spacers (62), and an M10 Nylon Locknut (93).
26.Route the end of the High Cable (100) through the indicated slot, around a 115mm Pulley (54), and down through the Press Top Frame (13).
Attach the 115mm Pulley (54) inside the Press Top Frame (13) with an M10 x 65mm Bolt (88), two M10 Washers (89), two 15mm x 12mm Spacers (62), and an M10 Nylon Locknut (93).
23 |
| Bracket | |
|
| ||
93 |
|
| |
|
|
| 86 |
| 54 |
| 16 |
| 101 |
| |
|
|
| |
24 |
|
|
|
| 93 |
|
|
|
| Bracket | |
12 |
|
|
|
|
|
| 105 |
|
|
| 101 |
| 54 |
| 93 |
| 16 |
| |
|
|
| |
25 |
|
|
|
|
|
| 54 |
93 | 100 |
| 13 |
|
|
| |
89 | 62 |
|
|
|
| 89 |
|
|
| 62 88 | |
26 |
|
|
|
| 93 |
| 54 |
| 62 | 100 | |
|
| ||
|
|
| |
Slot | 89 |
| 62 |
13 |
| ||
|
| 89 | |
|
|
| 88 |
13