22Introduction

Table 1

Task and estimated time

Task

Estimated Time

 

 

Preparing cable for installation

5 minutes for each power supply

 

 

Removing the power filler panel

1 minute for each power supply

 

 

Installing the DC power supply

2 minutes for each power supply

 

 

Removing the DC power supply cover

1 minute for each power supply

 

 

Cabling the DC power supply using

5 minutes for each power supply

washers and lugs

 

 

 

Replacing the DC power supply cover

1 minute for each power supply

 

 