30DC power supply installation

1Strip 0.81 in. (2.1 cm) of insulation from the ends of the cables.

2Crimp the lugs onto the cables using a standard crimping tool.

CAUTION

Risk of injury by electric shock

Failure to properly crimp the lugs onto the cables constitutes a safety hazard.

3If necessary, use a heat gun to shrink the tubing around the cable.

--End--

Job aid: Cable stripping requirements

The illustrations in this section provide details about cable stripping requirements for the 8005DI DC and 8005DC power supplies.

Removing the power filler panel

A power filler panel maintains the proper cooling airflow in the Ethernet Routing Switch 8300 chassis. You must remove the power filler panel from the power bay when you install a power supply in a bay for the first time.

Nortel Ethernet Routing Switch 8300

Installation — DC Power Supply

NN46200-310 01.01 Standard

9 June 2008

Copyright © 2008 Nortel Networks

Page 30
Image 30
Nortel Networks NN46200-310 manual Removing the power filler panel, Job aid Cable stripping requirements