.

21

Introduction

This guide provides information about the 8005 Dual Input (DI) DC and 8005DC power supplies used in the Ethernet Routing Switch 8300.

The guide also includes instructions for adding and replacing this DC power supply in the following Ethernet Routing Switch 8300 chassis models:

8306 Chassis

8310 Chassis

ATTENTION

This guide is intended for qualified service personnel with appropriate technical training and experience. The service personnel also must be aware of the hazards involved in installing and replacing customer-replaceable units.

CAUTION

This device is a Class A product. Operation of this equipment in a residential area is likely to cause harmful interference, in which case users are required to take appropriate measures necessary to correct the interference at their own expense.

For the minimum Ethernet Routing Switch 8300 software version required to support the hardware, see Nortel Ethernet Routing Switch 8300 Administration, NN46200-604.

Task and estimated time

The following table lists the estimated time to install a DC power supply for the Ethernet Routing Switch 8300.

The estimated installation time can range from 15 to 50 minutes. The installation time depends on the chassis model and the number of power supplies you are installing.

Nortel Ethernet Routing Switch 8300

Installation — DC Power Supply

NN46200-310 01.01 Standard

9 June 2008

Copyright © 2008 Nortel Networks

Page 21
Image 21
Nortel Networks NN46200-310 manual Introduction, Task and estimated time